Products

Everbuild Everflex AC50 Acoustic Sealant & Adhesive 380ml

Product code: 489513

£2.99 INC VAT
£2.49 EX VAT

Dispatch 2nd January 2025
Click and Collect Available

If all of your items are available for click & collect, you'll be able to select a location for pickup at checkout.

Stock availability for Everbuild Everflex AC50 Acoustic Sealant & Adhesive 380ml

Leeds

Unit 14 Gelderd Trading Estate, West Vale, Leeds, , LS12 6BD, .

Out of stock
Glasgow

Unit 30 Deerdykes View, Westfield, Cumbernauld, Glasgow, G68 9HN, .

Out of stock
Essex

The Garage Unit. The Forge, Ockendon Road, North Ockendon, , RM14 3PS, .

Out of stock
Caldicot

Unit 16A Norman Way, Severn Bridge Industrial Estate, Caldicot, Monmouthshire, NP26 5PT, .

In stock
Big savings on bulk orders Call 01708 855 698 for a bespoke quote
Product description
Everbuild Everflex Contract AC50 Acoustic Sealant & Adhesive is a high strength, permanently flexible sealant and adhesive specifically formulated for sealing and bonding plasterboard and other kraft lined insulation boards. Typically used for walls, ceilings and dry lining applications.
  • Solvent free
  • Overpaintable
  • Interior use
  • Independently tested to BS EN ISO 140/3
 
Areas For Use
  • To form an acoustic barrier by sealing gaps between plasterboard walls, floors and ceilings and in dry lining applications. 
  • As an adhesive to bond plasterboard to plasterboard, wood and metal studding and direct to blockwork.
  • For sealing and bonding most other Kraft lined insulation boards.
Limitations
  • Damp or humid conditions will significantly extend the cure time.
  • Do not attempt to abrade when cured.
  • Do not overpaint until product has fully cured. This will normally be 24 hours but may be 4-5 days in damp, cold or humid conditions.
  • Do not apply below 5°C
  • For overhead boarding applications, always use in conjunction with mechanical fixings.
More product detail
Show moreRead less
Size
380ml
Packs per box
12
Brand
Everbuild

Christmas Delivery Schedule

Orders placed after 2pm Wednesday 18th December will be processed following Thursday 2nd January 2025.

While every effort is made to deliver your order in the timeframe given, unexpected delays can occur due to the increased volume of deliveries our couriers handle at this time of year.

Please note: Our offices will be closed from 5pm Thursday 19th December until Thursday 2nd January 2025.

—